|
|
|
There are a number of settings in the Utilities section to ensure the J-codes information is captured for selected matters:
The Time Recording section has two options with settings for J-codes:
Charge Rate Maintenance enables you to create new rates or existing rates as J-code rates.
J-code rates can be set for fee earners as well as legal aid rates.
To set rates as J-code rates:
To create a new charge rate or see full details on Charge Rate Maintenance, please see the System Administration user guide.
These are created as standard when you upgrade to version 2.9.0 or beyond. However, they can be amended by selecting the item and right-clicking and selecting Edit from the shortcut menu.
To view the standard J-codes:
If the names and descriptions are changed, you can edit the codes. In the right-hand pane right-click the code and select Edit.
To enable matters to activate the J-code sections, work types can be flagged as a J-code work type.
To set a work type for J-code use:
Disbursements can be mapped to use default Expense codes.
To map disbursement types to Expense codes:
Document template properties have a J-code section to set default J-codes when a document is merged and saved with a time posting.
To set default J-codes for a document template:
A Billing category and ERROR: Variable (country-SCO-fee-not-billing) is undefined. codes are available for use with the Precedent H Cost Management.
Open Utilities and select Core PMS.
There is a Billing Code Category and 14 billing codes for use with J-codes as listed in the table below.
The first thirteen codes are for use when posting causing the time or disbursement to appear on the Precedent H form. The last, Exempt, is for use with time or disbursements you wish to record, such as Court Fees, but do not want to be shown on the aforementioned form.
| Code | Description |
Billing Code Category |
|
| MT | Multi-track |
Billing Codes |
|
| 01 Pre-Action Costs | Pre-Action Costs |
| 02 Issue/Pleadings | Issue/Pleadings |
| 03 CMC | CMC |
| 04 Disclosure | Disclosure |
| 05 Witness Statements | Witness Statements |
| 06 Expert Reports | Expert Reports |
| 07 PTR | PTR |
| 08 Trial Preparation | Trial Preparation |
| 09 Trial | Trial |
| 10 ADR/Settlement | ADR/Settlement |
| 11 Contingent Cost A | Contingent Cost A |
| 12 Contingent Cost B | Contingent Cost B |
| 13 Contingent Cost C | Contingent Cost C |
| 14 Exempt | Exempt |
When using Precedent H Cost Management, there are two points when you will receive a warning, first when you are approaching the set estimate and another when you exceed the stated estimate.
It is the approaching the estimate point value that can be amended. The default setting is 80.00 which is a percentage figure in line with other limit warnings.
This means that if you have an estimate costs figure of £100 you will receive the initial warning when a posting takes the actual costs figure above £80.00. If you set the warning limit to 75.00, then you will receive the warning when the posting takes the total above £75.00.
To set the warning limits for the stages: